Turn-key Project Execution:

HEC Executes various projects in the core sectors from concept to commissioning in different sectors like mining, power, steel plants, cement engineering etc.

Fields of specialization:

  • Material Handling Plant
  • Coal Handling Plants
  • Coal Washeries
  • Low Temperature Carbonisation Plant and Gas Treatment Plants
  • Tar distillation Plant & Processing Plants
  • Direct Reduction Plants from Iron Ore
  • Sinter Plants
  • Continuous Casting Plants for Billets, Slabs and Blooms
  • B.O.F. & Gas cleaning Plant
  • Lime Calcination Plants
  • Rolling Mills
  • Cement Plants.
Facilities
Wagon tippler
Facilities
Wagon Tippler Complex
Facilities
 
Facilities
Track Hopper Complex
Facilities
Stacker cum reclaimer in operation
Facilities
Conveyor Gallery
Facilities
BC 228A, B, 231 to PB Building



Coal Handling Plant at PARICHHA Thermal Power Station (UPSEB)




Strip Caster Mill for Mdni, Hyderabad




Coal Handling Plant at BINA, N.C.L. (C.I.L.)




Wagon loading station / BINA CHP/NCL




RETORTS FOR Low Temperature Carbunisation Plant ,DANKUNI / CIL




Rotory Wagon Tippler / IISCO,Burnpur




Pilot Sponge Iron Plant / R&D / SAIL




Chhatak Cement Plant / Bangladesh

Special Focus:

Concept to Commissioning for Bulk material Handling and steel plant projects

  • Feasibility studies & Site selection
  • Basic Engineering with Process Flow Sheets, Energy and Material Balance
  • Detail Specification of Plant and Process Equipment
  • Manufacturing, Erection, Testing & Commissioning of Plant & Equipment

Projects under Execution:

Ore Handling Plant, Part- A, PKG-060 BSP Bhilai

Scope Major Items Feature
Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of Ore Handling Plant on Turnkey basis. Wagon Tippler, Side Arm Charger, Electric usher Car, Twin Boom Stacker, Bucket Wheel Reclaimer, complete utilities etc. Conveyor system of 1500 TPH capacity of approx. 5.0 km length.

Ore Bedding & Blending Plant (OBBP) PKG-090 RSP Rourkela

Scope Major Items Feature
Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of Ore Bedding and Blending Plant & Base Blending facilities on Turnkey basis. Wagon Tippler, Side Arm Charger, Paddle feeder, Apron feeder, Hammer Crusher, Double Roll Crusher, Screens, Twin Boom Stacker, Bucket Wheel Reclaimer, Blender Reclaimer, Transfer Car, complete utilities etc. Conveyor system of 1500 TPH capacity of approx. 14.0 km length.

New Coal Handling Plant, PKG-062 BSP Bhilai

Scope Major Items Feature
Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of New Coal Handling Plant on Turnkey basis. Wagon Tippler, Side Arm Charger, Belt feeders, Weigh feeders, Electric Pusher Cars(3 Nos.), Stacker cum Reclaimer (5 Nos.), complete utilities etc. Conveyor system up to 1500 TPH capacity of approx. 7.5 km length.

Ore Handling Plant, Part- A, PKG-060 BSP Bhilai

Scope Major Items Feature
Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of Ore Handling Plant on Turnkey basis. Wagon Tippler, Side Arm Charger, Electric usher Car, Twin Boom Stacker, Bucket Wheel Reclaimer, complete utilities etc. Conveyor system of 1500 TPH capacity of approx. 5.0 km length.

Ore Bedding & Blending Plant (OBBP) PKG-090 RSP Rourkela

Scope Major Items Feature
Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of Ore Bedding and Blending Plant & Base Blending facilities on Turnkey basis. Wagon Tippler, Side Arm Charger, Paddle feeder, Apron feeder, Hammer Crusher, Double Roll Crusher, Screens, Twin Boom Stacker, Bucket Wheel Reclaimer, Blender Reclaimer, Transfer Car, complete utilities etc. Conveyor system of 1500 TPH capacity of approx. 14.0 km length.

New Coal Handling Plant, PKG-062 BSP Bhilai

Scope Major Items Feature
Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of New Coal Handling Plant on Turnkey basis. Wagon Tippler, Side Arm Charger, Belt feeders, Weigh feeders, Electric Pusher Cars(3 Nos.), Stacker cum Reclaimer (5 Nos.), complete utilities etc. Conveyor system up to 1500 TPH capacity of approx. 7.5 km length.

Coal Handling Plant at NCL, Krishnashila

Scope Major Items Feature
Planning. Design, Engineering, Construction, Fabrication, Supply, Erection, Trial-run, Commissioning and Testing of Coal Handling Plant (4.0 Mtpa) consisting of all Civil, Structural, Electrical and Mechanical Works and all other accessories and facilities required to make it complete in all respects on turnkey basis. Gyratory Crusher, 1600Tph - 1 No..Apron Feeder, 1600Tph- 2 Nos. EOT Crane, 150/30T- 1 No., Rock Breaker- 1No., Plough Feeder, 1800Tph - 4 Nos., 3000T SILO with RLS 5500TPH- 1No. Conveyor system of 1800 tph capacity of approx.3.1KM length etc. Target Coal Handling Capacity-4 MTPA

RMD/SAIL, Meghahatuburu Iron Ore Mines (MIOM)

Scope Major Items Feature
Installation of Tertiary Crushing System at Meghahatuburu Iron Ore Mines, Meghahatuburu, Dist: West Singbhum, Jharkhand on Divisible Turnkey Contract basis as per enclosed Tender Specification (ref. CET/14/RN/2758/TS/RM/01/ R=4 December 2010) and Standard Bidding Document (May 2009). Tertiary Crusher, 500Tph- 1 No. EOT Crane, 30/5T- 1 No. Vibrating Screen- 2 Nos. Storage bunker, 50M- 1 No. Vibro Feeder - 1 No., Fixed Tripper- 1 No.. Conveyor system of 900tph capacity of approx. 281 m length etc. Target Iron Ore Handling Capacity-5 MTPA

BCCL- Madhuband Washery at Dhanbad

Scope Major Items Feature
Planning, Design Engineering, selection of necessary equipment and Machinery, Procurement, delivery, erection/installation, Testing, Successful Commissioning of 5.0 MTPA Coal washing Plant at Madhuband including performance guarantee Test with 2 years critical spares and all allied activities necessary to put the plant for commercial operation. Receiving Hoppers : 5 Pockets of 100 T capacity each., Stack Tube : Ground storage of Capacity 8000 T, Clean Coal Silos : 2 X 6000 T (RCC Construction). Middlings Silo : 1 X 6000 T (RCC Construction) System Capacity = 5.0 MTPA, Belt Conveyor = 2.8 Km Approx.

Some of the projects executed:

Project & features Capacity Year of Completion
Coal Handling Plant at PARICHHA Thermal Power Station (UPSEB), UPSEB
Turnkey: Design to commissioning
Wagon Tippler, Ring Granulator, Plough Feeder, Conveyor (1.6 Km)
Civil, Structure, Electrics
675 TPH 1984
Jayant CHP, Northern Coal Fields Ltd.
Turnkey: Design to commissioning
Gyratory Crusher, Apron Feeder, EOT Crane, Conveyor (1 Km)
Civil, Structure, Electrics
1200 TPH 1987
Dankuni Coal Complex, Coal India Ltd.
Turnkey: Design to commissioning
Low Temperature Carbunisation Complex including : Wagon Tripler, Crusher, Screens, Conveyor (2.5 Km)
Civil, Structure, Electrics Upto
1000 TPH 1991
Lime Storage & Screening Plant, Bokaro Steel Plant
Turnkey: Design to commissioning
Screens, Conveyors
Civil, Structure, Electrics 
1500 TPH 1996
Coal Preparation Plant, Kedla, Central Coalfiels Ltd.
Consultancy servives for project & detailed engineering, construction, erection & commissioning of washery including CHP
Conveyors (4 Km)
650 TPH 2001
Raw Material Handling System (Phase-II), Rourkela Steel Plant
Turnkey: Design to commissioning
Wagon Tripler, Wagon Pusher, Apron Feeder, Cone & Roll Crushers, Inspectors, Rod Mills, Weigh feeders, Vibro Feeders & Screen, Conveyor (7 Km)
Civil, Structure, Electrics & PLC system Up to
1200 TPH 1996
Raw Material Handling System, NINL
Turnkey: Design to commissioning
Hammer Crusher, Feeders & screen, Conveyor (10.5 Km) Up to 
1000 TPH 2001
Second Launching Pad, ISRO
400 / 60 EOT Crane,
200 / 30 T EOT Crane
10T Tower Crane,
FCVRP, SD
Clean Room
Mobile Launching Pad
  2006
Coal Handling Plant (Ph-II), Nigahi, Northern Coal Fields Ltd.
Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning on Turnkey basis.
Major Items : Gyratory Crusher, Apron Feeder, EOT Crane, complete utilities etc.
Conveyor system of length approx. 4.0 km
3000T Silo with rapid wagon loading system of 5500 TPH. 