HEC executes various projects in the core sectors from concept to commissioning in different sectors like mining, power, steel etc.
Coal Handling Plant at PARICHHA Thermal Power Station (UPSEB)
Strip Caster Mill for Mdni, Hyderabad
Coal Handling Plant at BINA, N.C.L. (C.I.L.)
Wagon loading station / BINA CHP/NCL
RETORTS FOR Low Temperature Carbunisation Plant ,DANKUNI / CIL
Rotory Wagon Tippler / IISCO,Burnpur
Pilot Sponge Iron Plant / R&D / SAIL
Chhatak Cement Plant / Bangladesh
Project & features | Capacity | Year of Completion |
New Coal Handling Plant, PKG-062 BSP Bhilai Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of New Coal Handling Plant on Turnkey basis. Major Items: Wagon Tippler, Side Arm Charger, Belt feeders, Weigh feeders, Electric Pusher Cars(3 Nos.), Stacker cum Reclaimer (5 Nos.), complete utilities etc. Conveyor system up to 1500 TPH capacity of approx. 7.5 km length. |
1500 TPH | 2019 |
Ore Handling Plant, Part- A, PKG-060 BSP Bhilai Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of Ore Handling Plant on Turnkey basis. Major Items: Wagon Tippler, Side Arm Charger, Electric usher Car, Twin Boom Stacker, Bucket Wheel Reclaimer, complete utilities etc. Conveyor system of 1500 TPH capacity of approx. 5.0 km length. |
1500 TPH | 2017 |
Ore Bedding & Blending Plant (OBBP) PKG-090 RSP Rourkela Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of Ore Bedding and Blending Plant & Base Blending facilities on Turnkey basis. Major Items: Wagon Tippler, Side Arm Charger, Paddle feeder, Apron feeder, Hammer Crusher, Double Roll Crusher, Screens, Twin Boom Stacker, Bucket Wheel Reclaimer, Blender Reclaimer, Transfer Car, complete utilities etc. Conveyor system of 1500 TPH capacity of approx. 14.0 km length. |
1500 TPH | 2015 |
Coal Handling Plant (Ph-II), Nigahi, Northern Coal Fields Ltd. Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning on Turnkey basis. Major Items: Gyratory Crusher, Apron Feeder, EOT Crane, complete utilities etc. Conveyor system of length approx. 4.0 km 3000T Silo with rapid wagon loading system of 5500 TPH. |
1600 TPH | 2009 |
Second Launching Pad, ISRO 400 / 60 EOT Crane, 200 / 30 T EOT Crane 10T Tower Crane, FCVRP, SD Clean Room Mobile Launching Pad |
2006 | |
Raw Material Handling System, NINL Turnkey: Design to commissioning Hammer Crusher, Feeders & screen, Conveyor (10.5 Km) Up to |
1000 TPH | 2001 |
Coal Preparation Plant, Kedla, Central Coalfiels Ltd. Consultancy servives for project & detailed engineering, construction, erection & commissioning of washery including CHP Conveyors (4 Km) |
650 TPH | 2001 |
Lime Storage & Screening Plant, Bokaro Steel Plant Turnkey: Design to commissioning Screens, Conveyors Civil, Structure, Electrics |
1500 TPH | 1996 |
Raw Material Handling System (Phase-II), Rourkela Steel Plant Turnkey: Design to commissioning Wagon Tripler, Wagon Pusher, Apron Feeder, Cone & Roll Crushers, Inspectors, Rod Mills, Weigh feeders, Vibro Feeders & Screen, Conveyor (7 Km) Civil, Structure, Electrics & PLC system Up to |
1200 TPH | 1996 |
Dankuni Coal Complex, Coal India Ltd. Turnkey: Design to commissioning Low Temperature Carbunisation Complex including : Wagon Tripler, Crusher, Screens, Conveyor (2.5 Km) Civil, Structure, Electrics Upto |
1000 TPH | 1991 |
Jayant CHP, Northern Coal Fields Ltd. Turnkey: Design to commissioning Gyratory Crusher, Apron Feeder, EOT Crane, Conveyor (1 Km) Civil, Structure, Electrics |
1200 TPH | 1987 |
Coal Handling Plant at PARICHHA Thermal Power Station (UPSEB), UPSEB Turnkey: Design to commissioning Wagon Tippler, Ring Granulator, Plough Feeder, Conveyor (1.6 Km) Civil, Structure, Electrics |
675 TPH | 1984 |
Scope | Major Items | Feature |
---|---|---|
Coal Handling Plant at NCL, Krishnashila Planning. Design, Engineering, Construction, Fabrication, Supply, Erection, Trial-run, Commissioning and Testing of Coal Handling Plant (4.0 Mtpa) consisting of all Civil, Structural, Electrical and Mechanical Works and all other accessories and facilities required to make it complete in all respects on turnkey basis. |
Gyratory Crusher, 1600Tph - 1 No..Apron Feeder, 1600Tph- 2 Nos. EOT Crane, 150/30T- 1 No., Rock Breaker- 1No., Plough Feeder, 1800Tph - 4 Nos., 3000T SILO with RLS 5500TPH- 1No. | Conveyor system of 1800 tph capacity of approx.3.1KM length etc. Target Coal Handling Capacity-4 MTPA |
RMD/SAIL, Meghahatuburu Iron Ore Mines (MIOM) Installation of Tertiary Crushing System at Meghahatuburu Iron Ore Mines, Meghahatuburu, Dist: West Singbhum, Jharkhand on Divisible Turnkey Contract basis |
Tertiary Crusher, 500Tph- 1 No., EOT Crane 30/5T- 1 No. , Vibrating Screen- 2 Nos., Storage bunker, 50M- 1 No., Vibro Feeder - 1 No., Fixed Tripper- 1 No. | Conveyor system of 900tph capacity of approx. 281 m length etc. Target Iron Ore Handling Capacity-5 MTPA |
BCCL- Madhuband Washery at Dhanbad Planning, Design Engineering, selection of necessary equipment and Machinery, Procurement, delivery, erection/installation, Testing, Successful Commissioning of 5.0 MTPA Coal washing Plant at Madhuband including performance guarantee Test with 2 years critical spares and all allied activities necessary to put the plant for commercial operation. |
Receiving Hoppers: 5 Pockets of 100T capacity each, Stack Tube: Ground storage of Capacity 8000 T, Clean Coal Silos: 2 X 6000 T (RCC Construction). Middlings Silo : 1 X 6000T (RCC Construction) | System Capacity = 5.0 MTPA, Belt Conveyor = 2.8 Km Approx. |
Conveyors and Allied Equipment for Second IOSA Reclaiming Stream and Fifth
Ore & Flux Stacking Stream of RMHP –
RINL Design Engineering, Procurement, Supply, erection, testing, commissioning, PG Test of Conveyor system and allied equipment complete with civil, structural mechanical, electrical, instrumentation, dust suppression, ventilation and all necessary modification work required |
Suppression System, Water System, Fire Fighting System and Set of Electrics comprising PLC Automation | |
Augmentation of Raw Material Preparation Area for Revamping and Upgradation of SM 1 & 2 Project – RINL Design, engineering, procurement, manufacture, supply, storage, refurbishment/ upgradation of existing equipment, erection, painting of new plant and equipment, testing, commissioning and demonstration of performance guarantee tests within the battery limit of complete conveyor circuits for raw material preparation area, crushing and screening system for fuel & flux materials covering all mechanical, electrical, instrumentation & automation, telecommunication, civil, structural, water, utilities and auxiliary for the complete system required for the revamping & upgradation of Sinter Machine 1 & 2 | Conveyors, 4 nos. Swing Type reversible Hammer mill, 3 nos. Double Roll Crusher, Dust Suppression System, Water System, Fire Fighting System and Set of Electrics comprising PLC Automation |