|
FF/CC/02-Shop/Replacement of Smoke Tube/20-63
|
Replacement of Smoke Tube of Package Boiler installed in 02-SMS/FFP.
|
07/08/2020
|
09/08/2020
|
replacement_of_smoke_tube_of_pkg._boiler_installed_in_02-sms_ffp.pdf
|
first_time_extn_for_replacement_of_smoke_tube_of_package_boiler_installed_in_02_shop_ffp.pdf
|
third_time_extn_for_replacement_of_smoke_tube_in_02_shop_ffp.pdf
|
|
|
FF/CC/02-Shop/Revamping of DM Plant/20-62
|
Revamping of DM Plant of Package Boiler installed in 02-SMS/FFP
|
07/04/2020
|
09/08/2020
|
revamping_of_dm_plant_of_package_boiler_installed_in_02_sms_ffp.pdf
|
first_time_extn_for_revamping_of_dm_plant_of_package_boiler_installed_din_02_sms_ffp.pdf
|
third_time_extn_for_revamping_of_dm_plant_of_package_boiler_installed_din_02_sms_ffp.pdf
|
|
|
ACD/HMB/20/NFC/2133/OTE-6078 dtd 03.08.20
|
Procurement of NFC Items (through E Tender)
|
08/03/2020
|
09/03/2020
|
nit2133_compressed.pdf
|
corrigendum2133.pdf
|
|
|
|
ACD/HMB/20/SF/2135/OTE-6079 dtd 04.08.2020
|
Procurement of Machined Forged Blanks of Main Shaft HEC Drawing/Sketch and NIT(E Tender)
|
08/04/2020
|
08/29/2020
|
nit2135.pdf
|
|
|
|
|
HTP/PUR/190963/CNCLUW/AKS/20-023
|
SUPPLY OF TURNING TOOL
|
08/11/2020
|
08/27/2020
|
enq023.pdf
|
|
|
|
|
ACD/HMB/20/SA/2134/OTE-6080 dtd 06.08.20
|
Procurement of Sub Assly. Items as per HEC Drawing and NIT. through E tendering
|
08/06/2020
|
08/25/2020
|
nit2134.pdf
|
|
|
|
|
ACD/HMB/20/WC/2125/OTE-6083
|
Outsourcing a reviewing and approving agency of the fabrication drawings submitted by the detailing
|
08/08/2020
|
08/22/2020
|
nit2125.pdf
|
|
|
|
|
ACD/HMB/20/IC/2132/OTE-6077 dtd 01.08.20
|
Supply of Iron Casting Items as per HEC Drawing and NIT. through E tendering
|
08/01/2020
|
08/20/2020
|
nit2132_compressed.pdf
|
|
|
|
|
FF/CC/05/Revamping of furnace/20-66
|
Revamping of heating furnace no.:- 05-2506 in 05-Shop/FFP
|
07/20/2020
|
08/18/2020
|
revamping_of_heating_furnace_no._05-2506_in_05_shop_ffp.pdf
|
|
|
|
|
FF/CC/CMG/Enclosure for HV transformer/20-64
|
Enclosure & shed for HV Transformer of 2650T press in LPG yard/FFP
|
07/13/2020
|
08/12/2020
|
elclosure_and_shed_for_hv_transformer_of_2650t_press_in_lpg_yard_ffp.pdf
|
|
|
|
|
HTP/PUR/190953/LW140N/AKS/20-017
|
SUPPLY OF BALL SCREW
|
07/23/2020
|
08/10/2020
|
enq017.pdf
|
cenq017.pdf
|
|
|
|
ACD/HMB/20/SC/2131/OTE-6074 dtd 18.07.20
|
Procurement of Steel Casting Items as per HEC Drawing and NIT. through E tendering
|
07/18/2020
|
08/06/2020
|
nit2131_compressed.pdf
|
|
|
|
|
HTP/PUR/190956/LC125/AKS/20-014
|
SUPPLY OF HYD. CYLINDER
|
07/18/2020
|
08/05/2020
|
enq014.pdf
|
|
|
|
|
HMB/SMD/RC-North Karanpura/20-21/OPEN-558 Dt.16.07
|
Transportation for north karanpura
|
07/16/2020
|
08/03/2020
|
nit-north_karanpura.pdf
|
nit-north_karanpura.corrigendum.pdf
|
|
|
|
HMB-SS-VEHICLE-7223 DTD 09-07-2020
|
NIT for hiring of four wheel vehicle/bolero for SAS of DL at Amlohri NCL
|
07/09/2020
|
07/31/2020
|
nit(4).pdf
|
vehicle_nit_corrigendum_amlohri.pdf
|
|
|
|
PUR/HMB/20/968520/IS-6075 dt.20.07.2020
|
Procurement of ISMB500,ISMB450 & ISMB200
|
07/20/2020
|
07/30/2020
|
nit6075.pdf
|
|
|
|
|
HMB-SS-VEHICLE-7223 DTD 09-07-2020
|
NIT for hiring of four wheel vehicle/bolero for SAS of DL at Amlohri NCL for 12 months.
|
07/09/2020
|
07/25/2020
|
nit(3).pdf
|
|
|
|
|
HMBP/PUR/20/184745/TL-6067
|
Magnetic Base Core Drilling Machine
|
07/08/2020
|
07/24/2020
|
nit..pdf
|
|
|
|
|
HMBP/PUR/20/200509/OP-6066
|
procurement of paint and thinner
|
07/06/2020
|
07/22/2020
|
tendernotice_1(1).pdf
|
|
|
|
|
ACD/HMB/20/SF/2130/OTE-6062 dtd 02.07.20
|
Procurement of 80 T Hook & Hook Nut
|
07/02/2020
|
07/21/2020
|
nit2130.pdf
|
|
|
|