FF/CC/09-Shop/900 KW Motor/19-07
|
Shaft replacement and Dynamic Balancing of a Rotor of 900KW, 6.6 KV HT motor of Compressor House/FFP
|
10/16/2019
|
10/30/2019
|
shaft_replacement_and_dynamic_blancing_of_rotor_of_900kw_motor_in_compressor_house_in_ffp(1).pdf
|
|
|
|
FF/CC/09-Shop/1000 KW Motor/19-838
|
Repairing of 1000 KW slipring induction motor in 03 Shop FFP
|
08/20/2019
|
10/25/2019
|
repairing_of_1000_kw_slipring_induction_motor_in_03_shop_ffp.pdf
|
first_time_extn_for__repairing_of_1000_kw_slipring_induction_motor_in_03_shop_ffp.pdf
|
third_time_extn_for__repairing_of_1000_kw_slipring_induction_motor_in_03_shop_ffp.pdf
|
|
HMB/CM/19/04 dtd 25.09.19
|
Annual contract for removal of garbage from shops and departments of HMBP (2019-20)
|
09/25/2019
|
10/24/2019
|
nit_garbage.pdf
|
|
|
|
PUR/HMB/19/964502/GS-5852, dated 03.10.2019
|
Procurement of DA gas
|
10/03/2019
|
10/24/2019
|
hmb5852.pdf
|
|
|
|
ACD/HMB/19/SC& IC/2097/OTE-5848 dtd 30.04.19
|
Supply of Steel Casting & Iron Casting Items as per HEC Drawing and NIT. through E tendering
|
09/30/2019
|
10/21/2019
|
nit2097_compressed__final.pdf
|
|
|
|
HMBP/PUR/2019/322478/EL-5851 dated 01.10.2019
|
Procurement of Power Contactor with Coil. Make:SEIMENS/L&T/SCHNEIDER/ABB Only.
|
10/01/2019
|
10/21/2019
|
5851.pdf
|
|
|
|
PUR/HMB/2019/962034/EL-5787 dated 10.08.2019
|
Procurement of MISC items for dragline
|
08/10/2019
|
10/19/2019
|
5787.pdf
|
ext5787.pdf
|
|
|
PUR/HMB/19/965345/HW- 5837 dated 18.09.2019
|
Procurement of Fasteners
|
09/18/2019
|
10/19/2019
|
tenderextension965345.pdf
|
extension5837fasteners.pdf
|
|
|
HMB/ACD/WC/19/016/OPEN-5853, Dtd 03.10.19
|
ENGAGEMENT OF CONTRACTOR FOR UTILIZATION OF MACHINES IN HMBP PLANT
|
10/03/2019
|
10/17/2019
|
open_tender_machining_assist_thru_works_contract_file.pdf
|
|
|
|
FF/CC/03/Maint. of cranes & furnaces/19-812
|
Maintenance of cranes (3 Nos.) and furnaces (7 Nos.) in 03-Heavy Forge Shop/FFP
|
07/31/2019
|
10/15/2019
|
re-tener_for_maintenance_of_cranes_and_furnaces_of_heavy_forge_shop_in_ffp.pdf
|
first_time_extn_for__maintenance_of_of_crane_and_furnaces_in_03_shop_ffp.pdf
|
third_time_extn_for__maintenance_of_of_crane_and_furnaces_in_03_shop_ffp.pdf
|
|
HMBP/PUR/2019/322475/EL-5806 dated 20.08.2019
|
Procurement of Components for CNC Lab.
|
08/20/2019
|
10/05/2019
|
5806.pdf
|
extension2(1).pdf
|
|
|
HMB/CM/19/03 Dtd 02.09.19
|
Renovation of IED & CMIR section in CPL Building/ HMBP
|
09/02/2019
|
10/03/2019
|
ied_cmir.pdf
|
|
|
|
FF/CC/FPC/Fettling of steel casting/19-03
|
Fettling work of steel casting and grey iron castings in 05-Shop/FFP
|
09/04/2019
|
10/03/2019
|
fettling_of_steel_castings_in_05_shop_ffp.pdf
|
corrigendum_for_fettling_work_of_steel_casting_and_grey_iron_castings_in_05_shop_ffp.pdf
|
|
|
FF/CC/P & A/Cleaning of jungle/19-05
|
Cleaning of jungle, grass and removal of rubbish in FFP
|
09/16/2019
|
10/01/2019
|
cleaning_of_jungle,_grass_and_removal_of_rubbish_in_ffp(1).pdf
|
|
|
|
FF/CC/03-Shop/6000T Press Maint./19-807
|
Maintenance of 6000T Hydraulic Press in 03-Heavy Forge Shop/FFP
|
07/30/2019
|
09/28/2019
|
re-tender_for_maintenance_of_6000t_press_in_03-shop_of_ffp.pdf
|
first_time_extn_for__maintenance_of_6000t_hydraulic_press_in_03_shop_ffp(1).pdf
|
second_time_extn_for__maintenance_of_6000t_hydraulic_press_in_03_shop_ffp.pdf
|
|
PUR/FFP/2018/370511/62/389
|
Design, Manufacturing , Supply, Installation and Commissioning of Double Column Band Saw Machine
|
08/28/2019
|
09/27/2019
|
band_saw_machine_389.pdf
|
|
|
|
HMB/PUR/CP/19/100007/SI-5828
|
PROCUREMENT OF Safety items
|
09/05/2019
|
09/26/2019
|
100007.pdf
|
|
|
|
ACD/HMB/19/Misc/2094/OTE-5833 dtd 11.09.19
|
Supply of Steel Shots & Steel Grit as per NIT.
|
09/11/2019
|
09/26/2019
|
open_tender-2094.pdf
|
|
|
|
HMBP/PUR/2019/322479/EL-5826 dated 02.09.2019
|
Procurement of Flexible Cu Wire Make: Polycab/MESCAB/KEI/RR KABEL/HAVELLS/ANCHOR/FINOLEX ONLY.
|
09/02/2019
|
09/21/2019
|
nit5826.pdf
|
|
|
|
FF/CC/GP/Refractory Maint. of prod. & boiler/19-01
|
Annual running/emergency repair works of refractory lining of producer & boilers in Gas Plant/FFP
|
08/21/2019
|
09/20/2019
|
annual_running_or_emergency_repair_works_of_refractory_lining_of_producers_in_gas_plant.pdf
|
|
|
|