FFP/P&A/CLM/WCC/Z-II/2019-665 Annual Rate Contract for performing Specified intermittent nature of works arising in Work Zone-II. 12/23/2019 02/07/2020 tender_paper_zone-ii_compressed.pdf extension_document.pdf internal_advt-3rd_ext(1).pdf TOD has been extended up to 07.02.2020
FFP/P&A/CLM/WCC/Z-IV/2019-667 Annual Rate Contract for performing Specified intermittent nature of works arising in Work Zone-IV. 12/23/2019 02/07/2020 tender_paper_zone-iv_compressed.pdf extension_document(1).pdf internal_advt-3rd_ext(3).pdf TOD has been extended up to 07.02.2020
FFP/P&A/CLM/WCC/Z-I/2019-664 Annual Rate Contract for performing Specified intermittent nature of works arising in Work Zone-I. 12/23/2019 02/07/2020 tender_paper_zone-i_compressed.pdf extension_document(2).pdf internal_advt-3rd_ext.pdf TOD has been extended up to 07.02.2020
FFP/P&A/CLM/WCC/Z-III/2019-666 Annual Rate Contract for performing Specified intermittent nature of works arising in Work Zone-III. 12/23/2019 02/07/2020 tender_paper_zone-iii_compressed.pdf extension_document(3).pdf internal_advt-3rd_ext(2).pdf TOD has been extended up to 07.02.2020
ACD/HMB/20/TC/2114/OTE-5963 dtd 16.01.20 Teeth Cutting of Pinion as per NIT 01/16/2020 02/06/2020 nit2114.pdf todextension2114.pdf TENDERS THROUGH etender.gov.in is acceptable only.Tender closing dt is 06.02.20 & opening 07.02.20
ACD/HMB/20/SF/2113/OTE-5965 dtd 17.01.20 Procurement of Bush 01/17/2020 02/06/2020 nit2113.pdf TENDERS THROUGH etender.gov.in is acceptable only.Tender closing dt is 06.02.20 & opening 07.02.20
ACD/HMB/20/NFC/2116/OTE-5972 dtd 23.01.2020 Procurement of Worm Wheel 01/23/2020 02/01/2020 nit2116.pdf TENDERS THROUGH etender.gov.in is acceptable only.Tender closing dt is 01.02.20 & opening 03.02.20
HMBP/PUR/2019/322500/EL-5958 dated 11.01.2020 Procurement of Cu Cables .Offers only with authorisation from below" Makes" shall be considered. 01/11/2020 01/31/2020 5958.pdf Makes:Polycab/Mescab/Havells/Finolex/Lapp/Anchor/KEC ONLY. refer www.etender.gov.in
FF/CC/Stores/Sand unloading/Tender/19-23 Handling, cleaning of floors of the wagon, cleaning of railway track before arrival of rack in FFP 12/24/2019 01/31/2020 unloading_of_incoming_sand_from_railway_rack.pdf first_time_extn_for_handling_&_unloading_of_sand_from_railway_wagon_in_ffp.pdf TOD has been extended upto 25.01.2020
HMBP/PUR/2020/322504/EL-5962 dated 14.01.2020 Procurement of EPR Cables .Offers only with authorisation from below" Makes" shall be considered. 01/14/2020 01/31/2020 5962.pdf extension(2).pdf Make:Polycab/Universal/KEI/Shyam Cables only. Please refer www.etenders.gov.in
FF/CC/02-Shop/Pkg. Boiler/20-30 Annual Operation and Productive Online Maintenance of Fired Package Boiler installed in 02 Shop FFP 01/14/2020 01/29/2020 aom_of_pkg._boiler_in_02-shop_ffp.pdf TOD is 29.01.2020
FF/CC/09-Shop/900 KW Motor/19-17 Shaft repairing/refurbishment and Dynamic Balancing of broken Rotor of 900KW motor of compressor/FFP 12/14/2019 01/27/2020 shaft_repairing_and_dynamic_blancing_of_broken_rotor_of_900kw_motor_in_compressor_house_ffp.pdf first_time_extn_for_shaft_repairing_and_dynamic_balancing_of_broken_rotor_of_900_kw_motor_of_compres cancelation_of_tender_for__shaft_replacement_and_dynamic_balancing_of_rotor_of_900_kw_motor_in_ffp.p Tender has been cancelled.
FF/CC/Rate Contract for Hiring of JCB/20-25 Selection of an agency to provide JCB for housekeeping work in FFP, HMBP, HMTP & TA Div. 01/02/2020 01/16/2020 hiring_of_jcb_for_one_year_in_ffp.pdf TOD is 16.01.2020
FF/CC/Rate Contract for Hiring of Dumper/20-26 Selection of an agency to provide dumper for housekeeping work in FFP for a period of one year. 01/02/2020 01/16/2020 hiring_of_dumper_for_one_year_in_ffp.pdf TOD is 16.01.2020
FF/CC/02 Shop/Reconditioning of ladle heater/19-16 Overhauling and reconditioning of 2 nos. of gas fired 25T ladle heaters in 02 melting pit side/FFP 12/14/2019 01/09/2020 overhauling_and_reconditioning_of_2_nos._of_gas_fired_25t_ladle_heaters_in_02_melting_pit_side_ffp.p first_time_extn_for_reconditioning_of_02_nos._gas_fired_25t_ladle_heaters_in_02_shop_ffp.pdf TOD has been extended upto 09.01.2020
FF/CC/CMG/Maintenance of washroom/19-14 Maintenance of washroom to be used for Creche in FFP 12/02/2019 01/09/2020 maintenance_of_washroom_to_be_used_for_creche_in_ffp(1).pdf first_time_extn_for_maintenance_of_washroom_to_be_used_for_creche_in_ffp.pdf TOD has been extended up to 09.01.2020
FF/CC/Loco/Sleeper replacement/19-21 Cleaning cum sleeper replacement of the existing working track length of FFP 12/24/2019 01/07/2020 tender_notice_for_cleaning_cum_sleeper_replacement_of_working_track_length_of_ffp.pdf TOD is 07.01.2020
FF/CC/Loco/Sleeper replacement/19-22 Cleaning cum sleeper replacement of the existing working track length inside HMBP, outside SFW shop. 12/24/2019 01/07/2020 tender_notice_for_cleaning_cum_sleeper_replacement_of_working_track_length_of_hmbp..pdf TOD is 07.01.2020
FF/CC/03/Maint. of Acc. Stn./19-24 Maintenance of Accumulator Station Complex in 03-Forge Shop/FFP 12/24/2019 01/07/2020 maintenance_of_accumulator_station_complex_in_03_shop_of_ffp.pdf TOD is 07.01.2020
No. ACD/HMB/19/WC/2104/OTE-5927 Outsourcing for Design and preparation of detailed Fabrication Drawings 12/13/2019 12/27/2019 nit2104.pdf TOD Extended up to 06.01.2020