ACD/HMB/20/NFC/2116/OTE-5972 dtd 23.01.2020
|
Procurement of Worm Wheel
|
01/23/2020
|
02/01/2020
|
nit2116.pdf
|
|
|
|
|
HMBP/PUR/2019/322500/EL-5958 dated 11.01.2020
|
Procurement of Cu Cables .Offers only with authorisation from below" Makes" shall be considered.
|
01/11/2020
|
01/31/2020
|
5958.pdf
|
|
|
|
|
FF/CC/Stores/Sand unloading/Tender/19-23
|
Handling, cleaning of floors of the wagon, cleaning of railway track before arrival of rack in FFP
|
12/24/2019
|
01/31/2020
|
unloading_of_incoming_sand_from_railway_rack.pdf
|
first_time_extn_for_handling_&_unloading_of_sand_from_railway_wagon_in_ffp.pdf
|
|
|
|
HMBP/PUR/2020/322504/EL-5962 dated 14.01.2020
|
Procurement of EPR Cables .Offers only with authorisation from below" Makes" shall be considered.
|
01/14/2020
|
01/31/2020
|
5962.pdf
|
extension(2).pdf
|
|
|
|
FF/CC/02-Shop/Pkg. Boiler/20-30
|
Annual Operation and Productive Online Maintenance of Fired Package Boiler installed in 02 Shop FFP
|
01/14/2020
|
01/29/2020
|
aom_of_pkg._boiler_in_02-shop_ffp.pdf
|
|
|
|
|
FF/CC/09-Shop/900 KW Motor/19-17
|
Shaft repairing/refurbishment and Dynamic Balancing of broken Rotor of 900KW motor of compressor/FFP
|
12/14/2019
|
01/27/2020
|
shaft_repairing_and_dynamic_blancing_of_broken_rotor_of_900kw_motor_in_compressor_house_ffp.pdf
|
first_time_extn_for_shaft_repairing_and_dynamic_balancing_of_broken_rotor_of_900_kw_motor_of_compres
|
cancelation_of_tender_for__shaft_replacement_and_dynamic_balancing_of_rotor_of_900_kw_motor_in_ffp.p
|
|
|
FF/CC/Rate Contract for Hiring of JCB/20-25
|
Selection of an agency to provide JCB for housekeeping work in FFP, HMBP, HMTP & TA Div.
|
01/02/2020
|
01/16/2020
|
hiring_of_jcb_for_one_year_in_ffp.pdf
|
|
|
|
|
FF/CC/Rate Contract for Hiring of Dumper/20-26
|
Selection of an agency to provide dumper for housekeeping work in FFP for a period of one year.
|
01/02/2020
|
01/16/2020
|
hiring_of_dumper_for_one_year_in_ffp.pdf
|
|
|
|
|
FF/CC/02 Shop/Reconditioning of ladle heater/19-16
|
Overhauling and reconditioning of 2 nos. of gas fired 25T ladle heaters in 02 melting pit side/FFP
|
12/14/2019
|
01/09/2020
|
overhauling_and_reconditioning_of_2_nos._of_gas_fired_25t_ladle_heaters_in_02_melting_pit_side_ffp.p
|
first_time_extn_for_reconditioning_of_02_nos._gas_fired_25t_ladle_heaters_in_02_shop_ffp.pdf
|
|
|
|
FF/CC/CMG/Maintenance of washroom/19-14
|
Maintenance of washroom to be used for Creche in FFP
|
12/02/2019
|
01/09/2020
|
maintenance_of_washroom_to_be_used_for_creche_in_ffp(1).pdf
|
first_time_extn_for_maintenance_of_washroom_to_be_used_for_creche_in_ffp.pdf
|
|
|
|
FF/CC/Loco/Sleeper replacement/19-21
|
Cleaning cum sleeper replacement of the existing working track length of FFP
|
12/24/2019
|
01/07/2020
|
tender_notice_for_cleaning_cum_sleeper_replacement_of_working_track_length_of_ffp.pdf
|
|
|
|
|
FF/CC/Loco/Sleeper replacement/19-22
|
Cleaning cum sleeper replacement of the existing working track length inside HMBP, outside SFW shop.
|
12/24/2019
|
01/07/2020
|
tender_notice_for_cleaning_cum_sleeper_replacement_of_working_track_length_of_hmbp..pdf
|
|
|
|
|
FF/CC/03/Maint. of Acc. Stn./19-24
|
Maintenance of Accumulator Station Complex in 03-Forge Shop/FFP
|
12/24/2019
|
01/07/2020
|
maintenance_of_accumulator_station_complex_in_03_shop_of_ffp.pdf
|
|
|
|
|
No. ACD/HMB/19/WC/2104/OTE-5927
|
Outsourcing for Design and preparation of detailed Fabrication Drawings
|
12/13/2019
|
12/27/2019
|
nit2104.pdf
|
|
|
|
|
ACD/HMB/19/SC/2105/OTE-5918 dtd 02.12.19
|
Procurement of Steel Casting Items as per HEC Drawing and NIT. through E tendering
|
12/02/2019
|
12/21/2019
|
nit2105.pdf
|
todextension2105.pdf
|
tod2ndextension2105.pdf
|
|
|
FFP/Disp/Boiler Ash/Tender/October/2019/47
|
CLEANING CUM DISPOSAL SALE OF BOILER ASH FROM GAS PLANT FFP
|
10/24/2019
|
12/18/2019
|
nit_boiler.pdf
|
todextension(1).pdf
|
extensionboiler.pdf
|
|
|
HMBP/PUR/CP/19/200492/STY-5904
|
Procurement of different types of forms
|
11/15/2019
|
12/18/2019
|
200492.pdf
|
|
|
|
|
ACD/HMB/19/SF/2102/OTE-5909 dtd 21.11.19
|
PROCUREMENT OF Hook 80T and Hook Nut
|
11/21/2019
|
12/18/2019
|
nit2102.pdf
|
todextension2102.pdf
|
|
|
|
FF/CC/Gas Plant/Coal breaking/19-10
|
Sized coal preparation by manual breaking and through coal crusher in Gas Plant/FFP subject to avail
|
10/28/2019
|
12/09/2019
|
coal_breaking_in_gas_plant.pdf
|
first_time_extn_for_sized_coal_prepration_by_manual_breaking.pdf
|
third_time_extn_for_sized_coal_prepration_by_manual_breaking.pdf
|
|
|
HMBP/PUR/2019/322496/EL-5900 dated 13.11.2019
|
Procurement of FAGOR drive for CNC Lathe. Make: FAGOR ONLY.
|
11/13/2019
|
12/07/2019
|
5900.pdf
|
|
|
|