HMBP/PUR/20/968531/TL/OTE-6285
|
procurement of “Tools & Tackle”
|
10/26/2021
|
11/16/2021
|
NIT(1).pdf
|
|
|
|
FF/CC/Gas Plant/running repair of producer/21-127
|
Medium and running/emergency repair work of producer gas generator in Gas Plant/FFP
|
10/12/2021
|
11/11/2021
|
Medium and running emergency repair wok of producer Gas generator in GP of FFP.pdf
|
|
|
|
FF/CC/GP/Rocker Assembly/21-128
|
Detaching, repairing, re-conditioning & fitting of rocker assembly of cranes in Gas Plant/FFP
|
10/12/2021
|
11/11/2021
|
Repairing of Rocker Assembly of cranes in Gas Plant.pdf
|
|
|
|
HEC/PROJ/PUR/BLOCK B/17 Dated 18.10.2021
|
Cross Belt Magnetic Separator for Coal Handling Plant, Block B Project, Northern Coalfields Limited.
|
10/18/2021
|
11/09/2021
|
NIT.pdf
|
|
|
|
ACD/HMB/21/WC/2162-6282, Dtd: 09/10/2021
|
Engagement of contractor for shot/grit blasting and painting work to be done in HMBP premises
|
10/09/2021
|
11/02/2021
|
OTE2162.pdf
|
|
|
|
FF/CC/Stores/Unloading of materials/21-126
|
Unloading of refractory and raw materials in stores/FFP
|
09/24/2021
|
11/02/2021
|
Unloading of materials in store FFP.pdf
|
First Time extn for unloading of refractory materials in store FFP.pdf
|
|
|
HEC/ PROJ/ PUR/ MADHUBAND/131
|
Procurement of Workmen’s Compensation Policy
|
10/18/2021
|
11/02/2021
|
NITFIN.pdf
|
|
|
|
HMBP/Civil Maint./Construction of perimeter wall/2
|
Construction of collapsed perimeter wall near watch tower
|
10/05/2021
|
10/25/2021
|
Tender enquiryPerimeter wall-converted.pdf
|
Corrigendum-1 for HMBP-.pdf
|
|
|
HEC/PROJ/PUR/MADHUBAND/130
|
Supply of bearings for Madhuband NLW Coal Washery Project of BCCL
|
10/13/2021
|
10/19/2021
|
NIT130.pdf
|
|
|
|
HMBP/PUR/2021/322524/EL-6280
|
Supply of PCU 50 for CNC HB 1269 & 878 through etender mode
|
09/27/2021
|
10/19/2021
|
322524.pdf
|
|
|
|
HMBP/PROJ(CED)/BSL/450T/2021-1125
|
Various additional jobs in 2nd 450T Crane , BSL Bokaro
|
09/08/2021
|
10/04/2021
|
Tender.pdf
|
|
|
|
CAL/M/Cont/RT/Trailer(R)/(2021-22)/ 04 dt 03.09.21
|
Tender for Annual Rate Contract for transportation of goods by Trailer from Kolkata to Ranchi
|
09/03/2021
|
10/04/2021
|
NIT Trailer 2021.pdf
|
|
|
|
KOL/BO/M/Cont/RT/Truck(R) /21-22/03 dt 02.09.2021
|
Tender for Annual Rate Contract for transportation of goods by Truck from Kolkata to Ranchi
|
09/02/2021
|
10/01/2021
|
NIT Truck -2021.pdf
|
|
|
|
FF/CC/P & A/Requirement of workers/21-123
|
Requirement of two female manual workers in FFP
|
08/28/2021
|
09/13/2021
|
Requirement of two female manual workers in FFP.pdf
|
|
|
|
FF/CC/03 Shop/Resinking of Handle Rack Die/21-112
|
Resinking of Handle Rack Die (Main Die & Trimming Dies)
|
07/06/2021
|
09/09/2021
|
Resinking of die with drg.pdf
|
First Time extn for Resinking of Handle rack Die in FFP.pdf
|
Third Time extn for Resinking of Die in FFP.pdf
|
|
HMB/CMTU(CPL)/RT-WC02 Date 26.08.2021
|
Rate Contract for Radiographic Testing for In house Production Items for a period of three years.
|
02/09/2021
|
09/09/2021
|
rate contract.pdf
|
|
|
|
HMBP/P&A/NIT/2021-172
|
“Specified intermittent nature of works arising in HMBP/HEC.
|
08/03/2021
|
09/03/2021
|
Tender P&AHMB.pdf
|
|
|
|
FF/CC/P & A/Cleaning of road & toilets/21-
|
Cleaning-up of road, toilet blocks and horticulture inside plant & of 100 Bldg. of FFP
|
08/20/2021
|
09/03/2021
|
Cleaning-up of road and toilets of FFP.pdf
|
|
|
|
FF/CC/TSD/calibration of testing machine/21-114
|
AMC and Calibration of Testing Machines of Mechanical Laboratory,CMTU, 104 Bldg
|
07/06/2021
|
08/27/2021
|
AMC and calibration of Testing Measuring instrument in Lab TSD FFP.pdf
|
Third extn.pdf
|
|
|
FF/CC/GAS PLANT/PHENOLIC WATER COLLECTION/21-119
|
CLEANINC COLLECTION AND TRANSPORTATION OF PHENOLIC WATER FROM DIFFERENT POINTS IN FFP
|
08/05/2021
|
08/20/2021
|
Phenolic water collection-05-08.pdf
|
|
|
|