PUR/HMB/21/965620/MW-6232 DTD: 08.03.2021
|
CGL SYSTEM including spares for 5CuM Excavator
|
03/08/2021
|
03/24/2021
|
lte(8).pdf
|
|
|
|
HMBP/PUR/20/200510/LTE-6224, Date: 17.02.2021
|
procurement of “Inorganic Zinc Silicate Primer and Thinner”
|
02/17/2021
|
03/11/2021
|
nit510.pdf
|
corrigendum6224.pdf
|
|
|
CAL/PP/HMB/21/04
|
Limited Tender Enquiry for Procurement of ISSQ 100
|
03/04/2021
|
03/08/2021
|
lte_for_issq_100_(1).pdf
|
|
|
|
HMBP/PUR/2020/962069/EL-6214 dated 29.01.2021
|
Procurement of complete pacakge of electrics for 5 CuM Excavator.
|
01/29/2021
|
03/08/2021
|
6214.pdf
|
|
|
|
FF/CC/TSD/AMC & Calibration of UTM/21-101
|
AMC & calibration of UTM Instron Machine in Central Metallurgical Laboratory/FFP
|
02/18/2021
|
03/04/2021
|
amc_&_calibration_of_utm_and_measuring_equipments_in_mechanical_lab_-16.02.2021.pdf
|
|
|
|
FF/CC/INST/AMC of Spectrometer/21-100
|
AMC for Q8 Magellan Optical Emission spectrometer installed in Quantovac Lab, 104 Bldg. of FFP
|
02/16/2021
|
03/04/2021
|
amc_for_q8_magellan_emmission_spectrometer_of_q_lab-_13.02.21.pdf
|
|
|
|
HMBP/PUR/CP/2019/200528/OM-6227, Date: 23.02.2021
|
procurement of Toner
|
02/23/2021
|
03/03/2021
|
6227.pdf
|
|
|
|
CAL/PP/HMB/20/19/02
|
Limited Tender Enquiry for Procurement of Fastners
|
02/12/2021
|
02/27/2021
|
fastners(1).pdf
|
|
|
|
PUR/HMB/20/963132/BG – 6222, dated 09.02.2021
|
Procurement of Bearings
|
02/09/2021
|
02/23/2021
|
lte132-min.pdf
|
|
|
|
HEC/PROJ/PUR/IOSA/VIZAG/06 Dated: 02.02.2021
|
Procurement of Motorised Flap Gate
|
02/02/2021
|
02/19/2021
|
finalnit.pdf
|
|
|
|
FF/CC/02-Shop/ Repairing of chequered plate/21- 96
|
Replacement of chequered plates in 02 Shop/FFP
|
01/23/2021
|
02/17/2021
|
replacement_of_cheq._plate_in_02_shop_ffp_18.01.2021-converted.pdf
|
first_time_extn_for_replacement_of_chequered_plate_in_02_shop_ffp.pdf
|
|
|
PUR/HMB/21/171241/GS-6223, Dtd.- 11.02.2021
|
Procurement of LPG Gas Cylinder
|
02/11/2021
|
02/15/2021
|
hmb6223.pdf
|
|
|
|
HMBP/PUR/2020/962075/EL- 6212 dated 28.01.2021
|
Procurement of Field switch for 5 CuM Excavator MAKE: MEDITRON/TRANSGIETZ/ELECTROTEKNICA SWITCHGEARS
|
01/28/2021
|
02/13/2021
|
6212.pdf
|
|
|
|
FF/CC/02-Shop/Three times cleaning of VD/21- 98
|
Three times cleaning of VD system in 02 shop
|
01/29/2021
|
02/12/2021
|
three_times_cleaning_of_vd_system.pdf
|
|
|
|
FF/CC/02-Shop/Twelve times cleaning of VD/21-99
|
Twelve times cleaning of VD system consisting 12 shower as well as 1 meter valve in 02 shop
|
01/29/2021
|
02/12/2021
|
twelve_times_cleaning_of_vd_system.pdf
|
|
|
|
HMB/PUR/2020/962072/EL- 6201 dated 15.01.2021
|
procurement of Air conditioner for 5 CuM Excavator.MAKE: KABU PROJECTS/SUNBEAM APPLIANCE/FRIGORTECH
|
01/19/2021
|
02/10/2021
|
6201.pdf
|
|
|
|
PUR/HMB/21/965623/MW-6218 DTD: 02.02.21
|
Supply of Geared Coupling
|
02/02/2021
|
02/09/2021
|
nit_for_coupling.pdf
|
|
|
|
PUR/HMB/2020/962074/EL- 6183 dated 21.12.2020
|
Procurement of High Voltage Squirrel cage induction motor
|
12/21/2020
|
02/08/2021
|
6183.pdf
|
ext1(1).pdf
|
ext3.pdf
|
|
HEC/PROJ/RSP/40+40T/2021-1088 dated 22.01.21
|
Painting of Crane, Dismantling and re-erection of structure
|
01/22/2021
|
02/08/2021
|
tender_enquiry_for_painting_and_dismantling.pdf
|
|
|
|
HMB/QCA/21/2056 dtd 20.01.21
|
Engagement of Third Party for carrying out inspection of Twin Angle Large Ball with Hopper
|
01/20/2021
|
02/05/2021
|
nittwinqap.pdf
|
|
|
|