KOL/B.O./ADMN./2021/4
|
LTE hiring an agency for Annual Maintenance Contract (AMC) for 01 No Weighing Machine Transit Stores
|
07/12/2021
|
08/12/2021
|
NIT(2).pdf
|
LTE extension.pdf
|
LTE 2nd Extension.pdf
|
|
HEC/PROJ/PUR/BLOCK B/09
|
Procurement of FLUID COUPLING for CHP, BLOCK B Project, NCL
|
07/22/2021
|
08/12/2021
|
NIT(4).pdf
|
|
|
|
HEC/PROJ/PUR/BLOCK B/08
|
Procurement of Conveyor Belting (Steel Cord) for CHP, BLOCK B Project, NCL
|
07/21/2021
|
08/11/2021
|
NIT Steel Cord.pdf
|
|
|
|
HEC/ PROJ/ CONTRACT CELL/ 2021/ Gevra-370
|
Work of Civil and Structural for Substation Building for CHP, SECL Gevra Project
|
07/26/2021
|
08/10/2021
|
NIT(8).pdf
|
|
|
|
FF/CC/CMG/Manholes/21-114
|
Construction of Inspection Chamber, cleaning of Manholes, roof gutter and sewer line in FFP
|
07/27/2021
|
08/10/2021
|
Construction of inspection chamber cleaning of manholes.pdf
|
|
|
|
HEC/PROJ/PUR/BLOCK B/07
|
Procurement of Conveyor Belting ( Nylon Nylon) for Coal Handling Plant, BLOCK B Project, NCL
|
07/20/2021
|
08/10/2021
|
NIT(3).pdf
|
|
|
|
FF/CC/INST/AMC of Vacuum Spectrometer/21-116
|
AMC for Vacuum Spectrometer (Spectrometer M-11) installed at CMTU Lab/FFP
|
08/02/2021
|
08/09/2021
|
AMC for Vacuum Spectrometer in CMTU Lab FFP.pdf
|
|
|
|
FF/CC/INST/Calibration of Master Instrument/21-117
|
Recalibration of 13 nos. Master Instruments AT FFP/HEC Ltd.’s SITE
|
08/02/2021
|
08/09/2021
|
Recalibration of Master Instrument in Instrumentation Dept of FFP.pdf
|
|
|
|
FF/CC/INST/AMC of Metallurgical Microscope/21-118
|
AMC for Metallurgical Microscope & Gas Anylizer in INST /FFP
|
08/02/2021
|
08/09/2021
|
AMC of Metallurgical Microscope and gas anylyzer.pdf
|
|
|
|
KOL/B.O./ADMN./2021/3
|
LTE for hiring an agency for Annual Maintenance Contract (AMC) for Air Conditioning Machines HEC Kol
|
07/12/2021
|
08/04/2021
|
NIT(1).pdf
|
LTE extension(1).pdf
|
|
|
KOL/B.O./ADMN./2021/5
|
LTE for hiring an agency for Annual Rate Contract (ARC) for Pest Control Service HEC office Kolkata
|
07/12/2021
|
07/26/2021
|
NIT.pdf
|
|
|
|
HMB/PUR/CP/21/281908/OL- 6268
|
Procurement of Lubricants
|
07/17/2021
|
07/24/2021
|
6268.pdf
|
|
|
|
FF/CC/05-Shop/Servicing of air compressor/21-111
|
Servicing of Ingersoll-Rand make Air Compressor Model ML-160 installed in 05-Shop/FFP
|
07/06/2021
|
07/23/2021
|
Servicing of Ingersoll Rand make Air Compressor Model no- ML-160 installed in 05-Shop FFP.pdf
|
Servicing of Ingersoll Rand Make Air Comp- in 05 shop FFP.pdf
|
|
|
HMBP/PUR/CP/2021/110012/MED-6266 Dated-08.07.2021
|
Tender enquiry for rate contract for various types of ultrasonography tests
|
07/08/2021
|
07/15/2021
|
6266 pdf.pdf
|
|
|
|
HEC/PROJ/PUR/MADHUBAND-121 DATED 12.06.2021
|
Procurement of Brake Geared motor with pinion for the NLW Madhuband coal Washery project of BCCL Dha
|
06/12/2021
|
06/23/2021
|
FRESHNIT.pdf
|
|
|
|
FF/CC/02-Shop/Repairing of crane wheels/21-110
|
Repairing of crane wheels, gear boxes, cable trolleys and reconditioning of grabs in 02-Shop FFP
|
06/04/2021
|
06/19/2021
|
Repairing or replacement of Crane wheels cable trolleys in 02 Shop of FFP.pdf
|
|
|
|
FF/CC/TSD/Calibration of Sand testing equi./21-108
|
AMC & calibration of sand testing equipments in Lab/TSD/FFP/HEC Ltd.
|
04/17/2021
|
06/11/2021
|
AMC and calibration of sand testing equipments-13-04.pdf
|
First Time extn for AMC & calibration of sand testing equipments in Lab TSD FFP 26-05-2021.pdf
|
Second Time extn for AMC & calibration of sand testing equipments in Lab TSD FFP.pdf
|
|
FF/CC/INST/AMC of Metallurgical Microscope/21- 103
|
AMC of Metallurgical Microscope and Gas Anylizer in FFP
|
02/26/2021
|
05/29/2021
|
amc_of_metallurgical_microscope_and_gas_anylyzer.pdf
|
amc_for_gas_analyzer_in_inst_ffp_08.03.2021.pdf
|
AMC for gas analyzer in INST FFP.pdf
|
|
HEC/PROJ/PUR/MADHUBAND-121
|
Procurement of Brake Geared motor with pinion for the NLW Madhuband coal Washery project of BCCL Dha
|
05/15/2021
|
05/26/2021
|
FRESHNIT(1).pdf
|
|
|
|
FF/CC/Calibration of Sand testing equipment/21-104
|
AMC & calibration of sand testing equipments in NDT/TSD/FFP
|
04/01/2021
|
05/24/2021
|
AMC and calibration of sand testing equipments-01-04-2021.pdf
|
First Time extn for AMC & calibration of sand testing equipments in Lab TSD FFP.pdf
|
Third Time extn for AMC & calibration of sand testing equipments in Lab TSD FFP.pdf
|
|